Current Work

Our current projects:

City of Sarasota North Tamiami Trail AC Water Main Project

Project Website

City of Sarasota North Tamiami Trail AC Water Main Project


Project Details

  •  Work Type: AC Water Main Replacement
  •  Phase: Construction
  •  Limits:
    • Along North Tamiami Trail from 14th Street to University Parkway.
    • Along 16th Street from N. Tamiami Trail to Cocoanut Avenue.
    • Along 47th Street from N. Tamiami Trail to Rilma Avenue terminating at theNorth Water Tower.
  • City: Sarasota
  • County: Sarasota
  • Contractor: Metro Equipment Services, Inc.
  • Construction Cost: $28,985,263.22

About 

The City of Sarasota Utilities Department is replacing the existing 8-inch Asbestos Cement (AC) Water Main (WM) along US-41 to improve the distribution system resilience, and public safety, and welfare.

The project will require permits and close coordination from the Florida Department of Transportation (FDOT), Florida Department of Environmental Protection (FDEP), Florida Department of Health (FDOH), and the U.S. Army Corps of Engineer (USACOE.)

This project also includes:

  • The decommissioning and abandonment of an aging redundant 16” AC Force Main (FM) along N. Tamiami Trail from 17th Street to Lift Station #10 (located just Northeast of the Whitaker Bayou Bridge).
  • The abandonment of an aging 24-inch Cast Iron (CI) Reclaimed Line along N. Tamiami Trail from 18th Street to Whitaker Bayou.
  • Horizontal Directional Drilling (HDD) under Whitaker Bayou and bridge.
  • The replacement of 20 fire hydrants, new water service connections, and new meter boxes/covers.

 

 

 

City of Sarasota Meter Change Out Program

Project Website

Meter Change Out Program

Meter Change Out Program Description

 


About

As part of the City of Sarasota’s continued investment in critical public infrastructure, this project will replace all water meters throughout the city of Sarasota with advanced, wireless-enabled AMI meters. The new system supports proactive system monitoring, improved billing accuracy, and long-term sustainability of the County’s water resources.

The upgraded AMI system will allow the city of Sarasota’s Public Utilities to securely collect meter data remotely, reduce manual meter reads, and identify potential issues such as leaks or abnormal usage more efficiently.


Project Details

The city of Sarasota’s AMI upgrade will include the installation of Neptune’s T10 E-CODER R900i meters for 5/8″ through 2″ T10 water meter sizes.

Neptune’s T10 E-CODER R900i combines Neptune’s proven ultrasonic metering technology with integrated AMI communications, delivering accurate and reliable water usage data without moving parts.

Neptunes T10 E-Coder R900i Water Meter

Neptune’s T10 E-CODER R900i utilizes advanced ultrasonic metering technology with no moving parts, delivering consistent accuracy across both low and high flow ranges while reducing long-term maintenance requirements. The meter features an integrated E-CODER® absolute encoder register paired with a built-in R900i endpoint, enabling secure two-way AMI communication without the need for external wiring or programming.

Designed for flexible deployment, the system supports walk-by, mobile, and fixed network reading environments. Additional capabilities such as tamper detection and environmental monitoring enhance system integrity and operational awareness, making Neptune’s T10 E-CODER R900i a reliable, long-term metering solution for countywide AMI operations.

 

City of Sarasota Lateral Lining Project

About

Example of sewer pipe before and after lining.

City Utilities contractor, Pipeflow Solutions, will begin work on the sewer pipes starting Monday, March 30, 2026. Door hangers will be distributed at least 24 hours in advance of the work. Pipeflow Solutions will be inspecting, cleaning, and televising the pipes, and adding a new lining to make the pipes stronger. This work will take place in the area highlighted on the map below, which is the area of Hillview Street and Arlington Street, between S. Tamiami Trail East and South Shade Avenue. Your water and sewer service should not be interrupted. Please call the number on the door hanger, (855-858-1619), if you have questions. 


Map

This work will take place in the area highlighted on the map below, which is the area of Hillview Street and Arlington Street, between S. Tamiami Trail East and South Shade Avenue

This map shows a rectangle-shaped area in the City of Sarasota where workers will line sewer pipes. The area is between Tamiami Trail on the west, S. Shade Avenue on the east, Arlington Street on the north, and Hillview Street on the south.

Project Details

Contractor: Pipeflow Solutions

Pipeflow Solutions is working with the City of Sarasota to improve the sewer system in your area.

Project Phases

  1. CLEANOUT INSTALLATION
    1. A crew will install a new cleanout near your property.
    2. You may notice workers nearby.
    3. Water use will NOT be affected.
  2. LATERAL LINING
    1. A crew will be onsite performing pipe lining work.
    2. You will receive additional notice before this begins.
    3. Please MINIMIZE WATER USAGE during this time.
    4. Your lateral will be temporarily capped.
    5. This process typically takes 3-5 hours.
  3. LATERAL LINING CONNECTION
    1. Work will take place from the street side.
    2. Minimal disruption expected.

QUESTIONS?

A crew supervisor will be onsite during construction.

Please feel free to speak with them directly.

Telephone: 855-858-1619


Pipeflow solutions door hanger

 

  