Transporation Engineering Division

Print
Press Enter to show all options, press Tab go to next option

Note: Engineering Design Criteria Manual [EDCM] - Revision Process

The Engineering Design Criteria Manual [EDCM] is actively in the revision process for approximately the next 12-18 months. [May 2010 - November 2011]. During this time the NDS Engineering Division will be collecting recommendations for changes to sections of the EDCM. Please complete the information on the form below as applicable. Thank you for your assistance in this process.

Transportation Engineering staff regulates the public Rights-of-Way within the City of Sarasota. Public Right-of-Way refers to the area of land dedicated for public use, located between parcels of privately owned land. These include streets, alleys, parkways, sidewalks, drainage facilities, and other infrastructure. The Right-of-Way is typically dedicated for pedestrian and vehicular movement but can be used for other purposes such as the placement of landscaping, signage, public art, lighting and the placement of private and public utility equipment, both above and below ground. A Right-of-Way permit or Encroachment Agreement issued from the City is required in order to construct or place structures or objects in, or otherwise blocking access to, the public Right-of-Way. Click Here to view our Brochure of additional information and fees. The Transportation Engineering Division is located on the second floor of the City Hall Annex Bldg. and permitting hours are10:00 a.m. to 3:00 p.m. Monday through Friday, except holidays. Click below for Right-of-Way Permit forms and information.

Key Personnel

Right-of-Way Documents

Sidewalk Cafe Documents

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer